Picked up some stuff to carry on:
1" Bi-metal hole saw
1/4" cable clamps
3/8" cable clamps
1/2" cable clamps
3/4" ID grommets
1" Bi-metal hole saw
1/4" cable clamps
3/8" cable clamps
1/2" cable clamps
3/4" ID grommets
Patience, I want to fabricate and mount the diffuser before filling the WC, the tubes run through it, so if I filled it now, I would have to disconnect and fill it again later.CapnNismo wrote:
Build is coming along nicely. Turn the beast on!!
I usually am, and it made me unsatisfied with my last build. I have some time with this one cause some of the parts took awhile to get. That helped, and with buying a new house and shopping for a car, there hasn't been time for gaming so the laptop has been more than enough for me.CapnNismo wrote:
I think this is exactly the reason why I could never do any cool cooling systems - I'm far too impatient when I get new toys.
Well that certainly makes sense in your situation. Maybe if I was in a similar I could do it, lol. Though who knows.Nic wrote:
I usually am, and it made me unsatisfied with my last build. I have some time with this one cause some of the parts took awhile to get. That helped, and with buying a new house and shopping for a car, there hasn't been time for gaming so the laptop has been more than enough for me.CapnNismo wrote:
I think this is exactly the reason why I could never do any cool cooling systems - I'm far too impatient when I get new toys.
Fucker!Nic wrote:
503 cm of snow so far this month. No building today, I'm going shredding!
WTF pics of snow please!Nic wrote:
503 cm of snow so far this month. No building today, I'm going shredding!
What the,,,, 5m? thats hech lot of snow man.Nic wrote:
503 cm of snow so far this month. No building today, I'm going shredding!
yup, broke the record for November a couple days ago, still got 9 days left to go, and it was snowing when I left Whistler today. So good up there! Light and fluffy!GC_PaNzerFIN wrote:
What the,,,, 5m? thats hech lot of snow man.Nic wrote:
503 cm of snow so far this month. No building today, I'm going shredding!
didnt take any today, heres the website to where I was at: recent photos: http://www.whistlerblackcomb.com/photos/index.htmCammRobb wrote:
WTF pics of snow please!Nic wrote:
503 cm of snow so far this month. No building today, I'm going shredding!
woot whistlerNic wrote:
didnt take any today, heres the website to where I was at: recent photos: http://www.whistlerblackcomb.com/photos/index.htmCammRobb wrote:
WTF pics of snow please!Nic wrote:
503 cm of snow so far this month. No building today, I'm going shredding!
haffeysucks wrote:
woot whistler
And here I was, thinking you were talking about beta versions of XP and 7Nic wrote:
Yup, Blackcomb opens next week, gonna be sweet.
maybe I'll stop in at the longhorn and have a beer for apres today....max wrote:
haffeysucks wrote:
woot whistlerAnd here I was, thinking you were talking about beta versions of XP and 7Nic wrote:
Yup, Blackcomb opens next week, gonna be sweet.
Quite awhile, I was waiting for so long for Swiftech to release their 1156 adaptor plate for the Apogee GTZ, but they are being slouches on that front. So I had to give up on that and order a EK block that took forever to get here. Then I missed the sleeving at my shop, because it came in stock and out in 2 days.Mekstizzle wrote:
fuckin 'ell mate how long does it take to build a computer this thread seems to have lasted forever
lol... i was thinking the same thing... Hurry up and finish before the parts are outdated...Mekstizzle wrote:
fuckin 'ell mate how long does it take to build a computer this thread seems to have lasted forever